Saturday 20 April 2019

New Jobs KUANZIA DARASA LA 7 at Stiegler's Gorge Hydroelectric Power Station (SGHPS) | Deadline: 23rd April, 2019

  AjiraLeo Tanzania       Saturday 20 April 2019
WARNING
Beware of Job Scammers!
Please Never Pay Money To Get A Job!
Jobs in Tanzania 2019: New Job Vacancies at Stiegler's Gorge Hydroelectric Power Station (SGHPS) | Deadline: 23rd April, 2019
NAFASI ZA AJIRA MRADI WA KUZALISHA UMEME KIBITI
AJIRA TANZANIA 2019 / NAFASI ZA KAZI 2019
Stiegler's Gorge Hydroelectric Power Station (SGHPS), is a planned 2,100 megawatts (2,800,000 hp) hydroelectric dam in Tanzania. The power station is expected to produce 5,920GWh of power annually. The government of Tanzania has been considering establishing this power station since the 1960s. When fully developed, it will be the largest power station in Tanzania. The 134 metres (440 ft) arched, concrete dam is expected to create a reservoir lake, 100 kilometres (62 mi), in length, measuring 1,200 square kilometres (460 sq mi), with 34,000,000,000 cubic metres (1.2×1012 cu ft) of water. AjiraLeo Tanzania 
Read Also:
NEW TANZANIAN JOBS OPPORUNITIES 2019 (1,190+ POSTS)

In August 2017, the Tanzanian government advertised for bids to construct this dam. The selected contractor is expected to complete the dam in no more than 36 months.The power generated will be evacuated via a new 400kV high voltage power line to a substantiation where the power will be integrated into the national electricity grid.The government of Ethiopia is advising the Tanzanian government on the implementation of this project. (CHEKI TANGAZO KAMILI HAPA CHINI | See Advertisement In Picture Below For More details in Swahili language)
logoblog

Thanks for reading New Jobs KUANZIA DARASA LA 7 at Stiegler's Gorge Hydroelectric Power Station (SGHPS) | Deadline: 23rd April, 2019

Previous
« Prev Post

No comments:

Post a Comment